KEDS has announced that there will be no power outages after the entry into production of block B2 and A3, as the situation has stabilized for the moment.
However, KEDS says that saving electricity is necessary. “We invite consumers to join our call to save the electricity because every kilowatt is important, considering the energy crisis that has gripped the whole world”, reads the announcement of KEDS.
The Kosovo Energy Corporation (KEK) announced that it has completed the overhaul of block B2, the unit which has already returned to operation and is producing nearly 260 MW/h. Also, KEK has completed the remediation of water leaks in the A3 unit, which has returned to operation and is producing nearly 130 MW/h…